Purpose

The Apartment Building Construction Price Index (ABCPI) is a quarterly series measuring changes in contractors' selling prices of a representative apartment building.

The Building Construction Price Indexes (BCPI) are quarterly series that measure change over time in the prices that contractors charge to construct a range of new commercial, institutional, industrial and residential buildings.

Authority

Collected under the authority of the Statistics Act, Revised Statutes of Canada, 1985, Chapter S-19

Purpose

The Construction Contractors Survey (CCS) collects residential and non-residential construction price movements and market information across 11 census metropolitan areas in Canada. The information is used to produce various construction price indexes, including:

• the Non-residential Building Construction Price Index (NRBCPI)
• the Apartment Building Construction Price Index (ABCPI)
• the Construction Building Materials Price Indexes (CBMPI)
• the Electric Utility Construction Price Index (EUCPI).

These indexes are used in the calculation of the gross domestic product, which is an important indicator of the Canadian economy. Your information may also be used by Statistics Canada for other statistical and research purposes.

You are legally required to complete this questionnaire according to the Statistics Act.

Confidentiality

Statistics Canada is prohibited by law from releasing any information it collects which could identify any person, business, or organization, unless consent has been given by the respondent or as permitted by the Statistics Act. Statistics Canada will use the information from this survey for statistical purposes.

Data-sharing agreements

To reduce respondent burden, Statistics Canada has entered into data-sharing agreements with provincial and territorial statistical agencies and other government organizations, which have agreed to keep the data confidential and use them only for statistical purposes. Statistics Canada will only share data from this survey with those organizations that have demonstrated a requirement to use the data.

Section 11 of the Statistics Act provides for the sharing of information with provincial and territorial statistical agencies that meet certain conditions. These agencies must have the legislative authority to collect the same information, on a mandatory basis, and the legislation must provide substantially the same provisions for confidentiality and penalties for disclosure of confidential information as the Statistics Act. Because these agencies have the legal authority to compel businesses to provide the same information, consent is not requested and businesses may not object to the sharing of the data.

For this survey, there are Section 11 agreements with the provincial statistical agencies of Newfoundland and Labrador, Nova Scotia, New Brunswick, Quebec, Ontario, Manitoba, Saskatchewan, Alberta and British Columbia. The shared data will be limited to information pertaining to business establishments located within the jurisdiction of the respective province.

Section 12 of the Statistics Act provides for the sharing of information with federal, provincial or territorial government organizations. For this survey, there is a Section 12 agreement with the statistical agency of Prince Edward Island. Under Section 12, you may refuse to share your information with this organization by writing a letter of objection to the Chief Statistician, specifying the name of the survey and the organization with which you do not want Statistics Canada to share your data, and mailing it to the following address:

Chief Statistician of Canada
Statistics Canada
Care of Director, Producer Prices Division
150 Tunney's Pasture Driveway
Ottawa, ON
K1A 0T6

For agreements with provincial government organizations, the shared data will be limited to information pertaining to business establishments located within the jurisdiction of the respective province.

Record linkage

To enhance the data from this survey and to minimize the reporting burden, Statistics Canada may combine it with information from other surveys or from administrative sources.

Reporting instructions

Who should complete this questionnaire?
This questionnaire should be completed by an estimator for this business.

Reporting period:
For the purpose of this survey, please report information for the 15th day of the second month of the current quarter or the closest business day preceding the fifteenth.

Reporting instructions:
• Statistics Canada requires information on construction market conditions and quarterly price movements for specific building components. The specified building components are identified for you in the questionnaire.
• Question numbers may appear out of order. This is due to the design of the electronic questionnaire. Please continue to report data regardless of the question number.
• Do not press the Submit button until you have completed reporting for all building components and market conditions.

Printing your completed questionnaire:
You may print this questionnaire once you have completed and submitted it.

Business or organization and contact information

Business or organization and contact information - Question identifier:1.

Please verify the business or organization name and correct where needed.

  • 1: Legal name
  • 2: Operating name

Business or organization and contact information - Question identifier:2.

Please verify the business or organization contact person and address for this questionnaire and correct where needed.
The contact person is the person who should receive this questionnaire. The contact person may not always be the one who actually completes the questionnaire.

  • : First Name
  • : Last Name
  • : Title
  • : Email Address
  • : Address (number and street)
  • : City
  • : Province, Territory or State
  • : Postal Code or ZIP Code
  • : Country
  • : Telephone Number (including area code)
  • : Extension Number (if applicable)
  • : Fax Number (including area code)
  • : Preferred Language of Communication

Business or organization status

Business or organization status - Question identifier:1.

Is this business or organization currently in operation?

  • 1: Yes
  • 2: No (please explain - i.e, seasonal operations, ceased all operations, sold all operations, amalgamated with another business(es) or organization(s), temporarily inactive but will re-open, no longer operating due to other reason(s))

Construction market conditions in the selected city

Construction market conditions in the selected city - Question identifier:1.

Can this enterprise report construction market conditions and price movements in the selected city for the following construction market sector?

Non-Residential: Industrial, commercial, institutional or high-rise residential. High-rise residential includes condominium or apartment towers that have 5 or more storeys with steel framing.

Residential: Single-family or low-rise residential. This category would include single detached, townhome, duplex or row-house, and low-rise multi-dwellings that have fewer than 5 storeys with wood framing.

  • 1: Yes
  • 2: No

Construction market conditions in the selected city - Question identifier:2.

Can you report market conditions and price movements for industrial, commercial, institutional, high-rise residential, single family or low-rise residential construction projects in the selected city?

  • 1: Yes
  • 2: No

Selected city - Bid/Build

Selected city - Bid/Build - Question identifier:3.

Did this enterprise estimate or bid on a construction project in the selected city between the first month of the previous quarter and the last month of the previous quarter?

  • 1: Yes
  • 2: No

Selected city - Bid/Build - Question identifier:4.

(Non-Residential Construction) Think of a construction project that this enterprise estimated or bid on in the selected city between the first month of the previous quarter and the last month of the previous quarter.

If this enterprise had to estimate or bid on that same project on the 15th day of the second month of the current quarter (i.e., February, May, August, November), would the cost components remain the same, increase or decrease and by what percentage?

Include labour, material, machinery and equipment, overhead costs and profit margin changes when reporting price movements for each component.

Note:
• Please report for all division sub-categories that apply.
• Select "No change" if there was no price movement.
• The divisions referred to in this question are the "MasterFormat" divisions.

Selected city - Bid/Build - Question identifier:A.

Division 1 - General requirements:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Hoist rental
  • b: Temporary site wiring and site power
  • c: Temporary utility services
  • d: Site trailer
  • e: Trucking
  • f: Insurance rates
  • g: Labour (include site supervision)
  • h: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:B.

Division 2 - Existing Conditions:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Demolition
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:C.

Division 3 - Concrete:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Concrete forming or formwork
  • b: Reinforcement bars (e.g., 400 MPa rebar)
  • c: Welded wire mesh
  • d: Cast-in-place concrete
  • e: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:D.

Division 4 - Masonry:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Exterior brick veneer
  • b: Stone work
  • c: Concrete block masonry
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:E.

Division 5 - Metals:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Structural steel framing
  • b: Metal fabrications (e.g., metal stairs, railings, fence)
  • c: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:F.

Division 6 - Wood, plastics and composites:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Rough carpentry (e.g., framing, building rough temporary structures such as concrete forms, scaffolds, tunnels, installation of doors, windows and wood trim)
  • b: Plywood
  • c: Lumber
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:G.

Division 7 - Thermal and moisture protection:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Waterproofing and dampproofing
  • b: Thermal insulation
  • c: Membrane roofing system (e.g., asphalt layer with gravel surfacing, asphalt base sheet, adhesive, cants and felts)
  • d: Asphalt roofing
  • e: Prefinished metal roofing
  • f: Stucco finished walls, EIFS (exterior insulation and finish systems) with additional insulation and reinforcing
  • g: Vinyl siding
  • h: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:H.

Division 8 - Openings:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Metal doors
  • b: Wood doors
  • c: Metal windows
  • d: Wood windows
  • e: Vinyl windows
  • f: Glazing for windows and doors
  • g: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:I.

Division 9 - Finishes:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Drywall partitions (e.g., partition system comprised of gypsum board on both sides of metal studs of different dimensions)
  • b: Ceramic tile
  • c: Wood flooring (Include: hardwood and laminate)
  • d: Vinyl flooring
  • e: Carpeting
  • f: Painting
  • g: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:J.

Division 10 - Specialties:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Exterior signage ( e.g., "warehouse" sign)
  • b: Washroom accessories (e.g., toilet paper dispenser)
  • c: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:K.

Division 11 - Equipment:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Loading dock levelers
  • b: Laboratory hoods (steel)
  • c: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:L.

Division 14 - Conveying equipment:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Elevators
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:M.

Division 21 - Fire Suppression:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Fire suppression (e.g., sprinkler system)
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:N.

Division 22 - Plumbing:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Plumbing
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:O.

Division 23 - Heating, ventilation, air conditioning:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Heating
  • b: Ventilation
  • c: Air conditioning
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:P.

Division 25 - Controls and automation:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Controls and automation (e.g., thermostat, automatic light sensors)
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:Q.

Division 26 - Electrical:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Electrical
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:R.

Division 27 - Communications:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Communications (e.g., fibre optics)
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:S.

Division 28 - Electronic safety and security:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Electronic safety and security (e.g., smoke detection sensors)
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:T.

Division 31 - Earthwork:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Clearing site and finish grading
  • b: Excavation, excess removed from site
  • c: Backfill (Include: granular base, 4" thick, lowest floor)
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:U.

Division 32 - Exterior Improvements:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Asphalt paving
  • b: Concrete sidewalk
  • c: Planting (Include: landscaping, seeding, sodding, ground cover, shrubs, trees and transplanting)
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:V.

Division 33 - Utilities:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Utilities (e.g., water utility, sanitary and storm utility piping)
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:5.

(Residential Construction) Did this enterprise build a project in the selected city between the first month of the previous quarter and the last month of the previous quarter?

  • 1: Yes
  • 2: No

Selected city - Bid/Build - Question identifier:6.

(Residential Construction) Think of a project that this enterprise built in the selected city between the first month of the previous quarter and the last month of the previous quarter.

If this enterprise had to build that same project on the 15th day of the second month of the current quarter (i.e., February, May, August, November), would the cost components remain the same, increase or decrease and by what percentage?

Include labour, material, machinery and equipment, overhead costs and profit margin changes when reporting price movements for each component.

Note:
• Please report for all division sub-categories that apply.
• Select "No change" if there was no price movement.
• The divisions referred to in this question are the "MasterFormat" divisions.

Selected city - Bid/Build - Question identifier:A.

Division 1 - General requirements:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Site supervision and trailer
  • b: General contractors fee
  • c: Building permit costs and development charges
  • d: Insurance rates
  • e: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:B.

Division 2 - Existing Conditions:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Demolition
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:C.

Division 3 - Concrete:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Concrete forming or formwork
  • b: Reinforcement bars (e.g., 400 MPa rebar)
  • c: Welded wire mesh
  • d: Concrete supply and install
  • e: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:D.

Division 4 - Masonry:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Exterior brick veneer
  • b: Stone work
  • c: Concrete block masonry
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:E.

Division 5 - Metals:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Structural steel framing
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:F.

Division 6 - Wood, plastics and composites:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Rough and finish carpentry (Rough carpentry: include framing, building rough temporary structures such as concrete forms, scaffolds, tunnels, installation of doors, windows, baseboards and wood trim. Finish carpentry: include building furniture.)
  • b: Wood truss roof framing system
  • c: Kitchen cabinets
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:G.

Division 7 - Thermal and moisture protection:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Waterproofing and dampproofing
  • b: Thermal insulation
  • c: Asphalt shingles, flashing and vents
  • d: Membrane roofing system (e.g., asphalt layer with gravel surfacing, asphalt base sheet, adhesive, cants and felts)
  • e: Roof construction (Include: allowance for ice and water shield)
  • f: Stucco finished walls, EIFS (exterior insulation and finish systems) with additional insulation and reinforcing
  • g: Prefinished metal roofing
  • h: Vinyl siding
  • i: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:H.

Division 8 - Openings:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Metal doors
  • b: Wood doors
  • c: Metal windows
  • d: Wood windows
  • e: Vinyl windows
  • f: Glazing for windows and doors
  • g: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:I.

Division 9 - Finishes:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Gypsum board
  • b: Ceramic tile
  • c: Wood flooring (Include: hardwood and laminate)
  • d: Vinyl flooring
  • e: Carpeting
  • f: Painting
  • g: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:J.

Division 11 - Equipment:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Household appliances
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:K.

Division 14 - Conveying equipment:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Elevators
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:L.

Division 21 - Fire suppression:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Fire suppression (e.g., sprinkler system)
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:M.

Division 22 - Plumbing:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Plumbing
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:N.

Division 23 - Heating, ventilation, air conditioning:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Heating
  • b: Ventilation
  • c: Air conditioning
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:O.

Division 26 - Electrical:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Electrical
  • b: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:P.

Division 31 - Earthwork:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Clearing site and finish grading
  • b: Excavation, excess removed from site
  • c: Backfill (Include: granular base, 4" thick, lowest floor)
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:Q.

Division 32 - Exterior improvements:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Asphalt paving
  • b: Concrete sidewalk
  • c: Planting (Include: landscaping, seeding, sodding, ground cover, shrubs, trees and transplanting)
  • d: Please provide any comments explaining the price movement of this division.

Selected city - Bid/Build - Question identifier:R.

Division 33 - Utilities:
Change in cost components observed on the 15th day of the second month of the current quarter compared to those between the first month of the previous quarter and the last month of the previous quarter.

  • a: Utilities (e.g., water utility, sanitary and storm utility piping)
  • b: Please provide any comments explaining the price movement of this division.

Selected city - general construction market information

Selected city - general construction market information - Question identifier:7.

(Non-Residential) Has there been a noticeable change in the number of projects available for bidding in the selected city between the 15th day of the second month of the previous quarter and the 15th day of the second month of the current quarter?

  • 1: Yes - Please report the percentage change.
    Change Status:
    :Increasing
    :Decreasing
    :Notes or comments (optional)
  • 2: No

Selected city - general construction market information - Question identifier:8.

(Non-Residential) Has there been a noticeable change in the number of general contractors bidding on the jobs available in the selected city between the 15th day of the second month of the previous quarter and the 15th day of the second month of the current quarter?

  • 1: Yes - Please report the percentage change.
    Change Status:
    :Increasing
    :Decreasing
    :Notes or comments (optional)
  • 2: No

Selected city - general construction market information - Question identifier:9.

(Residential) Has there been a noticeable change in the number of subcontractors bidding on this enterprise's construction jobs available in the selected city between the 15th day of the second month of the previous quarter and the 15th day of the second month of the current quarter?

  • 1: Yes - Please report the percentage change.
    Change Status:
    :Increasing
    :Decreasing
    :Notes or comments (optional)
  • 2: No

Selected city - general construction market information - Question identifier:10.

Did this enterprise change its overhead in the selected city between the 15th day of the second month of the previous quarter and the 15th day of the second month of the current quarter?

  • 1: Yes - Please report the percentage change.
    Change Status:
    :Increasing
    :Decreasing
    :Notes or comments (optional)
  • 2: No

Selected city - general construction market information - Question identifier:11.

Did this enterprise change its profit margin in the selected city between the 15th day of the second month of the previous quarter and the 15th day of the second month of the current quarter?

  • 1: Yes - Please report the percentage change.
    Change Status:
    :Increasing
    :Decreasing
    :Notes or comments (optional)
  • 2: No

Selected city - general construction market information - Question identifier:12.

Did this enterprise's productivity change in the selected city between the 15th day of the second month of the previous quarter and the 15th day of the second month of the current quarter?

  • 1: Yes - Please report the percentage change.
    Change Status:
    :Increasing
    :Decreasing
    :Notes or comments (optional)
  • 2: No

Selected city - general construction market information - Question identifier:13.

What are the construction market conditions in the selected city on the 15th day of the second month of the current quarter?

  • : Very good
  • : Good
  • : Slow
  • : Very slow

Selected city - construction market issues

Selected city - construction market issues - Question identifier:14.

What issues are having an impact on the construction market in the selected city on the 15th day of the second month of the current quarter?
Select all that apply.

  • : Building Code changes
  • : Skilled labour shortages
  • : Labour rate increases
  • : Availability of land for development
  • : Availability of site services
  • : Land price increases
  • : Availability of materials
  • : Cost of construction materials
  • : Number of projects available - was there an increase or decrease in projects available?
  • : Competition among subcontractors - was there an increase or decrease in competition among subcontractors?
  • : Competition among general contractors - was there an increase or decrease in competition among general contractors?
  • : Tax regime changes - please specify the tax regime changes. Federal, Provincial or Municipal.
  • : OR No issues are having an impact on the selected city's construction market

Selected city - level of activity

Selected city - level of activity - Question identifier:15.

Please estimate the level of activity in the selected city's construction market for the next 6 months.

  • : Increasing (please estimate the percentage change)
  • : Flat
  • : Decreasing (please estimate the percentage change)
  • : Notes or comments (optional)

Contact person

Contact person - Question identifier:16.

Statistics Canada may need to contact the person who completed this questionnaire for further information. Is this person the best person to contact?

  • 1: Yes
  • 2: No - Who is the best person to contact about this questionnaire?
  • : First Name
  • : Last name
  • : Title
  • : Email Address
  • : Telephone number (including area code)
  • : Extension number (if applicable)
  • : Fax number (including area code)

Feedback

Feedback - Question identifier:17.

How long did it take to complete this questionnaire?
Include time spent gathering the necessary information.

Feedback - Question identifier:18.

Statistics Canada reviews all feedback.
We invite your comments about this questionnaire.

Date modified: